Press the slash key anywhere on the page to jump to search. Use the arrow keys to move through results and Enter to open one.

CAMO.A.315(b)(1) — Maintenance programme management

On this page
Regulation section

CAMO.A.315(b)(1) requires the CAMO to ensure that an aircraft maintenance programme (AMP), including any applicable reliability programme, is developed and controlled as required by M.A.302 or ML.A.302.

The CAMO's programme duty

The specific approval routes and the express derogation route of the applicable rule must be applied; there is no universal formula under which the AMP is always a document approved by the authority.

Under CAMO.A.315(b)(1), the CAMO ensures that the AMP is developed and controlled. The Part-M programme requirements cover the authority's instructions; the instructions of the relevant design approval holders and declarants and those in the certification specifications; maintenance frequencies and operation-specific tasks; and, where required, a reliability programme. Applicable ADs remain mandatory under M.A.301(f).

Approval and declaration routes

The applicable AMP rule depends on the annex that applies to the aircraft.

For Part-M aircraft, M.A.302(b)–(c) applies, including the conditions for indirect approval: eligibility of the CAMO or CAO or of a limited contract, a procedure in the approved exposition, and oversight by the State of registry or a transfer of responsibility.

For Part-M, M.A.302(b) requires the competent authority to approve the AMP and its amendments. Under M.A.302(c), a CAMO or CAO managing the aircraft, or engaged under the limited contract in M.A.201(i)(3), may use an indirect approval procedure established in its exposition and approved by its competent authority. That route normally requires the CAMO or CAO to be under the oversight of the State of registry, unless the written transfer arrangement under point 3 of point M.1 applies. Indirect approval is not permitted for the escalation of safety-related tasks under M.A.302(e).

Article 3(2) allocates the following other than complex motor-powered aircraft to Part-ML: aeroplanes of 2 730 kg maximum take-off mass or less; helicopters of 1 200 kg or less certified for up to four occupants; other ELA2 aircraft; and non-conventional aircraft of 1 200 kg or less if they can maintain zero horizontal speed in flight, or 2 730 kg or less otherwise. Aircraft listed in the air operator certificate of a licensed air carrier use Part-M instead. The scope in Article 1 and the permit-to-fly arrangements in Article 3(4) also remain relevant.

For Part-ML, ML.A.302(b) permits the owner to declare the AMP only when the continuing airworthiness of the aircraft is not managed by a CAMO or CAO; otherwise the CAMO or CAO responsible for managing it approves the AMP. The owner who declares the AMP, or the organisation that approves it, keeps it updated. The derogation in ML.A.302(e) applies separately.

For Part-M, the AMP and its amendments require approval under M.A.302(b)–(c). For Part-ML, the approval or declaration route in ML.A.302(b) applies, or the derogation in ML.A.302(e) where every one of its conditions is met.

Part-M uses the approval framework of M.A.302(b)–(c), with its specific conditions for indirect approval. Part-ML uses its own routes, approval by the managing organisation or declaration by the owner, and an express derogation under which no AMP document is required. Under ML.A.302(b)(1), the AMP is declared by the owner where the continuing airworthiness of the aircraft is not managed by a CAMO or CAO; where it is managed by a CAMO or CAO, ML.A.302(b)(2) provides for approval by the CAMO or CAO responsible for managing the continuing airworthiness of the aircraft.

Pages and procedures should always state which annex applies, because the approval route and responsibilities differ.

Programme content and deviations

The AMP organises the maintenance of the aircraft. Under M.A.302(f), it contains details of all maintenance to be carried out, including its frequency and any operation-specific tasks. In the case defined in ML.A.302(e) for Part-ML aircraft, no separate AMP document is required, although the programme content set out in ML.A.302(f) still applies.

The applicable mandatory requirements and the permitted routes for developing the programme and deviating from instructions need to be read together. Under M.A.302(e), the owner or the organisation managing the continuing airworthiness of the aircraft may propose deviations from the specified instructions for continuing airworthiness, and escalated intervals, on the basis of the prescribed review data. Indirect approval cannot be used for the escalation of safety-related tasks.

For Part-M, M.A.302(d) applies together with the express deviation and escalation route in M.A.302(e) and its conditions. Treating all type-certificate holder instructions as an unalterable minimum would remove a permitted route.

M.A.302(e) permits the owner or the organisation managing the continuing airworthiness of the aircraft to deviate from the specified instructions for continuing airworthiness and to propose escalated intervals, based on data from sufficient reviews under M.A.302(h); it may also propose additional instructions. Under M.A.302(f), the AMP must contain details of the maintenance, including frequencies, and operation-specific tasks. Under M.A.302(g), a reliability programme is required for complex motor-powered aircraft when the AMP is based on maintenance steering group logic or on condition monitoring, subject to the treatment Article 3(7) specifies for multi-turboprop aeroplanes of 5 700 kg or less.

Applicable mandatory continuing-airworthiness tasks must be addressed. M.A.301(f) requires the accomplishment of applicable ADs, operational directives with a continuing-airworthiness impact, continuing-airworthiness requirements established by the Agency, and measures required by the competent authority in immediate reaction to a safety problem. For Part-ML aircraft under the derogation route, ML.A.302(f)(3) expressly includes the airworthiness limitation section (ALS) and other mandatory continuing-airworthiness information in the AMP.

Under ML.A.302(e)–(f), no AMP document, owner declaration or organisation approval is required only when all of the following conditions are met: all instructions for continuing airworthiness issued by the design approval holder and all non-mandatory maintenance recommendations are followed without deviation; no additional maintenance tasks arise from specific installed equipment and modifications, repairs, life-limited and flight-safety-critical components, special operational approvals, or the use of the aircraft and its operational environment; and all relevant pilot-owners are authorised to perform pilot-owner maintenance. In that case, the AMP consists of the specified instructions for continuing airworthiness, the maintenance recommendations, the mandatory continuing-airworthiness information, and the tasks arising from specific operational or airspace directives or requirements for particular instruments and equipment. If a relevant pilot-owner is not authorised, the derogation is unavailable.

Review and amendment

The AMP is controlled and kept updated under the applicable rule. M.A.302(h) requires periodic reviews and amendment when necessary, taking into account operating experience, instructions from the competent authority, and new or modified maintenance instructions from the listed publishers of design data.

For Part-M, the binding standard is periodic review under M.A.302(h): the AMP must be reviewed periodically and amended when necessary to keep it up to date and valid in light of the specified operating experience and instructions.

When these rules apply

CAMO.A.315(b)(1) has applied in its current form since 24 March 2020. M.A.302(h) has applied in its current form since 25 August 2023. The Article 3(2) allocation of non-conventional aircraft to Part-ML has applied since 13 February 2026.

Part CAMO Training

Building a compliant CAMO operation?

Sofema's Part CAMO course covers SMS obligations, airworthiness review processes, and the management system requirements for continuing airworthiness organisations.

View Part CAMO course

Sources

Next step Sofema Aviation Academy

Courses for CAMO.A.315

Part M Subpart I for Airworthiness Review Staff with VO

1 day · No Voice Over

Why: covers continuing airworthiness management tasks for Part-CAMO.

View course

Related training, not a regulatory requirement. Check course scope and prerequisites before enrolling.

A different role or training goal? Course Finder

Educational reference, not legal advice. Verify against the current Official Journal text linked under Sources. How this hub is made.