Press the slash key anywhere on the page to jump to search. Use the arrow keys to move through results and Enter to open one.

145.A.20 — Terms of approval and scope of work

On this page
Regulation section

145.A.20 establishes that a Part 145 approval is granted based on a defined scope of work, and the organisation may only perform maintenance within the terms and limitations specified on its approval certificate and within the scope of work specified in its maintenance organisation exposition (MOE).

What it means in practice

The terms of approval attached to the certificate specify the privileges and the scope of the activities that the organisation is approved to conduct, including any limitations as applicable. This is specified using a class and rating system. For aircraft maintenance, the ratings are A1 (aeroplanes above 5 700 kg maximum take-off mass (MTOM)), A2 (aeroplanes of 5 700 kg MTOM and below), A3 (helicopters) and A4 (aircraft other than A1, A2 and A3 aircraft), and the limitation column states the manufacturer or the group or series or type and/or the maintenance tasks; for A4 it also states the aircraft category (sailplane, balloon, airship, etc.) when applicable, and for A2, A3 and A4 whether the issuing of airworthiness review certificates is authorised (only possible for aircraft covered by Annex Vb (Part-ML)). For components other than complete engines or APUs, the ratings are C1 to C23, and the limitation column states the aircraft type or aircraft manufacturer or component manufacturer or the particular component and/or cross-refers to a capability list in the exposition and/or the maintenance task(s). An organisation may hold multiple ratings across different classes. Within the approval class(es) and rating(s) established by the competent authority, the scope of work specified in the MOE defines the exact limits of its approval.

The approval certificate, EASA Form 3-145, is the official document that states the approved scope. Any maintenance performed outside the terms stated on that certificate is unauthorised. The terms of approval also set any specific limitations, such as restrictions to a particular aircraft or engine manufacturer, group, series or type, or to particular maintenance tasks.

Key requirements

The organisation must ensure that all maintenance is performed strictly within the scope of its approval. The class and rating system provides the framework: Class A covers aircraft maintenance (line and base), Class B covers engine maintenance, including APUs (rating B3), Class C covers maintenance of components other than complete engines or APUs, and Class D covers specialised services. Each class is further divided into ratings, and ratings may only be mentioned on the approval if they are appropriately limited: the limitation column states what the table in Appendix II requires for each rating, such as the aircraft or engine manufacturer, group, series or type, the particular component or a capability list in the exposition, the particular NDT method(s), and/or the maintenance task(s).

Any change to the terms of approval, such as adding a new aircraft type or component rating, must be applied for and approved by the competent authority before the work commences. By way of derogation from 145.A.85(a)(1), when a component capability list is used that could be subject to frequent amendments, the organisation may propose to include such amendments in the procedure referred to in 145.A.85(c) for changes not requiring prior approval. The regulation is explicit that the organisation shall comply with the terms of approval attached to its certificate and with the scope of work specified in its Maintenance Organisation Exposition (MOE) — the certificate and the MOE together define the legal boundary of permitted activity.

Common compliance gaps

One compliance gap is performing maintenance tasks that subtly exceed the approved scope, for example, performing work on a sub-variant of an aircraft type that is not covered by the manufacturer, group, series or type stated in the limitation column for the rating. Organisations should regularly review the terms of approval attached to their certificate and the scope of work specified in their MOE against actual work being performed.

Part 145 Training

Ready to master Part 145 compliance?

Go beyond the regulation text. Sofema's Part 145 course covers practical compliance strategies, quality system obligations, and real audit scenarios.

View Part 145 course

Sources

Next step Sofema Aviation Academy

Courses for 145.A.20

EASA Part 145 Regulation EU 1321/2014 (Part 145 Initial) with VO

2.5 days · Voice Over

Why: covers the approval, findings and continued-validity requirements for Part-145.

View course

Related training, not a regulatory requirement. Check course scope and prerequisites before enrolling.

A different role or training goal? Course Finder

Educational reference, not legal advice. Verify against the current Official Journal text linked under Sources. How this hub is made.