145.A.10 sets the scope of Section A of Part 145: as amended by Regulation (EU) 2021/1963, it establishes the requirements to be met by an organisation to qualify for the issue or continuation of an approval certificate for the maintenance of aircraft and components. Within Section A, applications for a certificate or for an amendment to an existing certificate are addressed in 145.A.15, the terms of approval and scope of work in 145.A.20 and the continued validity of the certificate in 145.A.90.
What it means in practice
Organisations involved in the continuing airworthiness of aircraft and components for installation thereon, including maintenance, shall be approved, upon their request, by the competent authority in accordance with the requirements of Annex II (Part-145), Annex Vc (Part-CAMO) or Annex Vd (Part-CAO), as applicable to the respective organisations. In the Part 145 class and rating system, category A class ratings are subdivided into base and line maintenance categories; an organisation may be approved for either or both, and a line facility located at a main base facility requires a line maintenance approval. For a Part 145 organisation that has its principal place of business in a territory for which a Member State is responsible under the Chicago Convention, the competent authority is the authority designated by that Member State, or by another Member State in accordance with Article 64 of Regulation (EU) 2018/1139, or the Agency if the responsibility has been reallocated to the Agency in accordance with Articles 64 or 65 of Regulation (EU) 2018/1139; for an organisation that has its principal place of business outside such a territory, it is the Agency (EASA).
145.A.10 does not itself draw the boundary between Part 145 and other Parts. Annex Vd (Part-CAO) establishes the requirements to be met by a combined airworthiness organisation (CAO) in order to be issued, upon application, an approval for the maintenance and continuing airworthiness management of aircraft and components for installation thereon, and to continue carrying out those activities, where such aircraft are not classified as complex motor-powered aircraft and are not listed in the air operator certificate of an air carrier licensed in accordance with Regulation (EC) No 1008/2008. Understanding which regulation applies to your specific activities is the first step toward compliance.
Note that 145.A.10 itself only frames the scope of Section A — the technical and organisational requirements. It does not set out the conditions under which an approval must be obtained.
Key requirements
In accordance with its MOE, an organisation approved under Part 145 is entitled to issue certificates of release to service in respect of completion of maintenance in accordance with point 145.A.50; its certificate remains valid subject to compliance with all of the conditions in point 145.A.90.
Applicants for an initial certificate shall provide the competent authority with the results of a pre-audit performed by the organisation against the applicable requirements provided for in Annex I (Part-M), Annex Vb (Part-ML) and Part-145, and documentation demonstrating how they will comply with the requirements established in Regulation (EU) No 1321/2014. When satisfied that the organisation complies with the applicable requirements, the competent authority issues the certificate (EASA Form 3-145) in accordance with the class and rating system provided for in Appendix II and formally approves the MOE; for initial certification, all findings must be corrected to the satisfaction of the competent authority before the certificate can be issued.
The regulation also makes clear that maintenance means any one or combination of the following activities: overhaul, repair, inspection, replacement, modification or defect rectification of an aircraft or component, with the exception of pre-flight inspection.
Common compliance gaps
One compliance gap is organisations performing work that falls outside their terms of approval, or outside the scope of work specified in their MOE, without recognising the regulatory boundary. This can occur when a facility gradually takes on additional capabilities, such as moving from line to base maintenance tasks, without first applying for and obtaining the competent authority's prior approval of the change to its terms of approval.
Part 145 Training
Ready to master Part 145 compliance?
Go beyond the regulation text. Sofema's Part 145 course covers practical compliance strategies, quality system obligations, and real audit scenarios.
View Part 145 course