Aircraft Fuel Tank Safety Training Phases 1 & 2 is aimed at persons who are receiving FTS training for the first time. It is intended to equip you with the necessary understanding regarding all issues associated with Fuel Tank Safety identified by the following documents: Annex 1 to ED Decision 2009-006-R / Annex to ED Decision 2009-007-R / Annex II to ED Decision 2022/011/R.
The term CDCCL (Critical Design Configuration Control Limitations) refers to the design characteristics that have to be retained during maintenance or modification.
This means that disturbing systems related to, adjacent to, or having a potential impact on fuel systems identified as being at risk (as identified during the accomplishment of the stipulations of SFAR 88 and related JAR or EASA documents) may be subject to special inspections identified as CDCCL tasks in Instructions for Continued Airworthiness (ICA) and in Aircraft Maintenance Programs (AMPs).
The term Fuel Tank Safety (FTS) is typically used as it is more accurate with regard to training considerations.
Resources
Student Feedback
You need to be enrolled in this course to leave a review.
0.00
out of 5
5
0
4
0
3
0
2
0
1
0
No reviews yet. Be the first to review this course.