1. What qualifies an MRO as an EASA Third-Country Part-145 Component Workshop?
An MRO located outside the territory of EASA Member States that holds an independent EASA Part-145 approval specifically rated for C-category components (e.g., C1 through C22) under Commission Regulation (EC) No 1321/2014.
2. How does a foreign component workshop obtain initial EASA Part-145 approval?
By applying directly to EASA Foreign Part-145 Organization Oversight, submitting a compliant Maintenance Organisation Exposition (MOE), demonstrating compliance with 145.A.10 through 145.A.202, and passing an EASA physical audit.
3. What role does the Maintenance Organisation Exposition (MOE) play in third-country approvals?
The MOE is the core document defining the organization's scope of work, procedures, management structure, facility specifications, and compliance commitment under 145.A.70.
4. How are bilateral aviation safety agreements (BASAs) referenced for third-country component workshops?
Where an agreement exists (e.g., US-EU BASA), specialized maintenance implementation procedures (MIP) or special conditions govern approval; without a BASA, direct EASA oversight and rules apply fully.
5. What are the facility requirements under 145.A.25 for foreign component repair stations?
Workshops must provide specialized environment-controlled working spaces, segregation of clean/contaminated areas, protection from weather, and secure storage for components and materials.
6. How are unexpected changes to the organization managed under 145.A.85?
Any change affecting the approval scope, key management personnel, facilities, or core procedures requires prior approval by EASA before operational implementation.
7. What happens when EASA issues a Level 1 Finding during an audit?
A Level 1 finding (145.A.95) represents significant non-compliance lowering safety standards, resulting in immediate partial or complete limitation or suspension of the approval certificate.
8. What constitutes approved maintenance data for component workshops under 145.A.45?
Current Component Maintenance Manuals (CMMs), OEM Overhaul Manuals, Service Bulletins, and EASA-approved repair design data or Supplemental Type Certificates (STCs).
9. What are the strict criteria for incoming component acceptance under 145.A.42?
Components must be accompanied by acceptable release documentation (e.g., EASA Form 1 or equivalent authorized tag), verified for physical integrity, and checked against non-hazard status.
10. Can a third-country component workshop fabricate replacement parts?
Yes, but strictly within its approved capability list and in accordance with detailed procedures in the MOE (145.A.42), using OEM data for internal use during maintenance only.
11. How must equipment and calibrated tools be controlled per 145.A.40?
Tools and test equipment must be controlled, calibrated to national standards at defined intervals, and logged in a verifiable tool management system.
12. What are the specific requirements for issuing an EASA Form 1 under 145.A.50?
An EASA Form 1 can only be issued by authorized certifying staff upon completion of all maintenance tasks in accordance with approved data, ensuring the component is in a safe condition for release.
13. What is the record-keeping requirement under 145.A.55 for component workshops?
Detailed records of all work performed, including technical logs, sub-component release certificates, and calibration data, must be retained for at least 3 years from the date of release.
14. How are subcontracted maintenance activities managed under 145.A.75?
Subcontracted work must remain under the quality system and management control of the approved Part-145 organization, which retains ultimate airworthiness responsibility.
15. What are the main components of the mandatory 145.A.200 Management System?
An integrated SMS including safety policy, risk management procedures, hazard identification, safety assurance, safety promotion, and an independent compliance monitoring function.
16. What is the purpose of the Internal Safety Reporting Scheme under 145.A.202?
To collect, analyze, and investigate internal safety reports and operational occurrences without fear of reprisal, driving continuous safety improvements across the organization.
17. How must certifying staff competence be evaluated under 145.A.30 and 145.A.35?
Through formal initial and recurrent training, practical assessment, detailed knowledge of EASA regulations, human factors, SMS, and documented technical evaluations.
18. What constitutes an occurrence reportable to EASA under 145.A.60?
Any condition of a component identified during maintenance that has resulted or may result in an unsafe condition or seriously hazards flight safety must be reported within 72 hours.
19. How are production planning procedures implemented under 145.A.47?
Workshops must establish a workload planning system ensuring sufficient qualified staff, tools, data, and time are systematically allocated to complete tasks safely.
20. What is required for continuous validity of an EASA foreign Part-145 approval?
Continuous compliance with EASA Part-145 regulations, granting EASA access for audits, timely resolution of findings, and prompt payment of annual oversight fees.
Found this useful?
Share it with your network on LinkedIn.