Sofema Aviation (SA) considers key aspects of the forthcoming Ground Handling Regulations to include issues challenges and best practices Scope of Part-ORGH
Understanding the Scope of Part-ORGH
Article 2 of Regulation (EU) 2025/20 establishes strict boundaries around ground handling (GH) services at EU aerodromes. The goal is to prevent regulatory overlap with air operations, aerodrome operations, and aircraft maintenance. Correctly categorizing services is essential for Ground Handling Service Providers (GHSPs) to maintain compliance while avoiding unnecessary administrative burdens.
Included Services (Article 2(2))
- Passenger & Baggage Handling: Safe passenger boarding/disembarkation, terminal-to-aircraft transport, and baggage sorting, building, and transfer.
- Aircraft Servicing & Turnaround: Ground Support Equipment (GSE) operation, refueling, water/toilet servicing, de-icing/anti-icing, towing/pushback, and physical loading/unloading.
- Cargo & Mail Handling: Restricted strictly to on-airport activities, including final build-up, pre-transport checks, and ramp transport. Off-airport cargo handling is explicitly excluded and managed under the airline's system.
Specific Exclusions (Article 2(3))
- Flight Dispatch: Covered under Air Operations (Regulation (EU) No 965/2012).
- Load Control (Phase 1): Load planning and mass & balance calculations fall under Air Operations rules.
- Marshalling: Aircraft guiding is an aerodrome safety function governed by Regulation (EU) No 139/2014.
- Ground Supervision & Maintenance: Official representation and maintenance tasks (e.g., oil handling, exterior cleaning) are governed by continuing airworthiness rules (Regulation (EU) No 1321/2014).
Core Challenges for GHSPs & Aviation SMEs
1. Regulatory Fragmentation
GHSPs providing bundled services (e.g., baggage handling, marshalling, and load planning) must navigate three separate regulatory frameworks: Part-ORGH, Aerodromes, and Air Ops. Operational declarations submitted to authorities must explicitly omit excluded services to avoid regulatory confusion.
2. The "Dispatcher" Terminology Trap
Under Regulation (EU) No 965/2012 and ICAO Annex 6, a "flight dispatcher" holds licensed operational control over a flight. On the ramp, however, "dispatcher" is informally used for turnaround coordinators, creating legal liability risks.
Best Practice: EASA strongly advises GHSPs to completely remove the term "dispatcher" from ground operations manuals and rename these roles to "ramp coordinator" or "ramp supervisor".
Key Exclusions Deep Dive: Marshalling & Load Control
Aircraft Marshalling (Aerodrome Jurisdiction)
Because marshalling is governed by Regulation (EU) No 139/2014, it is not approved via the Part-ORGH declaration process:
- Pure Marshalling Providers: Completely exempt from Part-ORGH declarations; approval stems directly from aerodrome compliance and local operational agreements.
- Mixed Service Providers: Must file a Part-ORGH declaration for ground handling tasks while excluding marshalling, leading to dual regulatory oversight and potential audit fatigue.
Best Practices: Use visual demarcation in operational manuals to separate Part-ORGH from Aerodrome chapters, maintain separate training matrices for marshalling assessments, and coordinate directly with local aerodrome operators to align procedures.
Split Load Control Responsibilities
EASA structurally divides load control into two phases:
- Phase 1 (Planning & Calculations): Encompasses mass and balance calculations, LIR, NOTOC, and load sheet issuance. Excluded from Part-ORGH, Phase 1 is strictly governed by Regulation (EU) No 965/2012 under the airline's responsibility.
- Phase 2 (Physical Ramp Verification): Involves physical verification of the load against instructions at the aircraft and last-minute change (LMC) communication. This falls directly within the scope of Part-ORGH.
- Best Practices: Explicitly separate Phase 1 (outsourced Air Ops under ORO.GEN.205) and Phase 2 (Part-ORGH) in Service Level Agreements (SLAs). Establish robust communication protocols between remote load controllers and local ramp coordinators, and segregate training/audit records for central planners versus apron staff.