Risk is subjective. How a hazard is perceived depends entirely on the "lens" through which an aviation professional views the operation.
The CAMO Perspective (The Planners)
For a CAMO, risk is often viewed through compliance and reliability trends. Their perspective is longitudinal.
· They focus on aging aircraft, Airworthiness Directive (AD) compliance, and engine health monitoring.
· A CAMO might view a repeated technical fault as a "manageable trend" that can be solved by a future engineering order, whereas a pilot or line mechanic might see it as an immediate threat to flight safety.
The AMO Perspective (The Doers)
For an AMO, risk is tactical and human-centric. They focus on Production Related Issues, tool control, "dirty dozen" human factors, and hangar floor safety.
· An AMO might perceive a deferred maintenance item (MEL) as "standard procedure" because it is legally allowed, while the CAMO views the accumulation of such items as a degradation of fleet airworthiness that increases the likelihood of a major grounding.
The SMS Operator Perspective (The Oversight)
The SMS manager must synthesize these perspectives to find the "Real Risk." They look for the gap between Work as Imagined (the manuals) and Work as Done (the reality in the hangar or cockpit). Their job is to ensure that one department’s convenience doesn't become another department’s catastrophe.
The Interaction of Likelihood and Consequences
Risk is formally defined as the product of two variables. In aviation SMS, we use a Risk Matrix to visualize this interaction.
Likelihood (Probability)
This is the estimated frequency at which an event might occur. In aviation, we categorize this from Frequent (likely to occur many times) to Extremely Improbable (unlikely to occur in the total life of the fleet).
Consequences (Severity)
This is the potential outcome of the hazard. It ranges from Minor (slight interference) to Catastrophic (hull loss or multiple fatalities).
Practical Application: CAMO vs. AMO
To see how these variables interact in different environments, consider the hazard of unapproved parts (SUPs) entering the inventory.
· From a CAMO perspective, the likelihood might be considered High if the supply chain is global and complex, and the consequence is Catastrophic due to potential structural failure mid-flight.
- Their mitigation focuses on stricter auditing of vendors and documentation.
· From an AMO perspective, the likelihood might be perceived as Low if they have robust stores inspection at the point of entry.
- However, they see the consequence as Major in terms of immediate rework, loss of certificate, or potential fire during testing.
- Their mitigation focuses on physical inspection and "Quarantine" procedures.
Interaction in Decision Making
The interaction of likelihood and consequence creates three zones of action for aviation organizations:
The "Normalization of Deviance" Trap
In a mature SMS, we operate under the assumption that safety is a byproduct of maintaining rigid margins. However, when an organization experiences a "long quiet period" (low likelihood of failure), the perceived risk curve flattens.
The technical expert understands that risk is a product of Risk = P \times S (Probability × Severity). Normalization of deviance occurs when the "P" is repeatedly observed as zero, leading the human brain to heuristically discount "S" to zero as well.
In the AMO: Tactical Shortcuts and "Tribal Knowledge" - In the hangar, deviance often starts as a "practical workaround" to meet a Turnaround Time (TAT) or to compensate for tooling deficiencies.
Re-Anchoring the Severity (Consequence) - The SMS must constantly remind the organization that Severity is a Constant, while Likelihood is a Variable.
Next Steps
Sofema Aviation Services (SAS) and Sofema Aviation (SA) Provide Classroom, Webinar & Online training. Explore 525+ aviation courses at Sofema, or contact [email protected] for support.
Found this useful?
Share it with your network on LinkedIn.