EASA Part M Technical FAQ | Large Aircraft Continuing Airworthiness

An overview of key EASA Part M requirements covering continuing airworthiness, component control, records, structural repairs, and aircraft lifecycle management.

24-08-2026
6 Min read

Evolving Cross-Border Architectures & Regulatory Obligations

Sofema Aviation provides an overview of key EASA Part M requirements covered in the Part M For Large Aircraft with VO course, including continuing airworthiness, component control, records, structural repairs, and aircraft lifecycle management.

1. What defines a 'large aircraft' under EASA Part M regulatory frameworks?

A large aircraft is defined as an aircraft classified as an aeroplane with a maximum certificated take-off mass (MCTOM) exceeding 5,700 kg, or a multi-engined helicopter. Operations involving large aircraft require strict adherence to EASA Part M managed through an approved Continuing Airworthiness Management Organisation (CAMO) or Part-CAMO.

2. How does EASA Basic Regulation (EU) 2018/1139 impact Part M compliance for operators?

Regulation (EU) 2018/1139 establishes the overarching framework for safety management, environmental protection, and airworthiness. It reinforces CAMO accountability, mandating systematic risk assessment, clear organizational responsibility, and integration between flight operations and maintenance oversight.

3. What are the key responsibilities of an operator under M.A.201?

Under M.A.201, the operator is responsible for the continuing airworthiness of the aircraft. This includes ensuring all maintenance is performed in accordance with the Aircraft Maintenance Programme (AMP), Airworthiness Directives (ADs) are embodied, operational equipment is serviceable, and modifications/repairs are approved.

4. How does M.A.202 occurrence reporting operate within a CAMO structure?

M.A.202 requires the organization to report any condition of the aircraft or component identified that hazards flight safety to the competent authority, the state of registry, and the organization responsible for the type design within 72 hours of identification.

5. What is the required regulatory scope for subcontracting CAMO tasks under Part M?

A CAMO may subcontract specific continuing airworthiness management tasks to non-approved or approved organizations under its quality system. However, ultimate accountability remains with the contracting CAMO, requiring formal contractual procedures, active quality audits, and authority acceptance.

6. What are the core considerations regarding Maintenance Check Flights (MCF)?

MCFs must be conducted in accordance with EASA Part-SPO or Part-CAT requirements when required after maintenance. Subpart C guidelines mandate that the CAMO establishes clear flight procedures, flight crew qualification criteria, and technical assessment protocols prior to release.

7. How are organization approval ratings structured under EASA continuing airworthiness frameworks?

Approval ratings define the scope of work an organization is permitted to execute, categorized by aircraft type, component class, or specialized service (e.g., non-destructive testing). Maintenance management must align strictly within the scope approved in the organizational exposure document.

Structural Repairs, Modifications & Component Control

8. What constitutes valid maintenance data under M.A.304 for modifications and repairs?

Damage assessments and repair executions must utilize data approved by EASA, the Type Certificate Holder (TCH), or an approved Part 21 Design Organization Approval (DOA) holder. Standard structural repair manuals (SRM) apply only within their explicitly stated allowable thresholds.

9. How are life-limited parts (LLP) managed under M.A.503 requirements?

Subpart E (M.A.503) mandates that life-limited parts must not exceed their approved operational limit. The CAMO must maintain complete operational history logs, including total operating hours, flight cycles, and accumulated service life verified by original birth records.

10. What is the classification standard for aircraft component installation under M.A.501?

Components must be classified into clear categories: serviceable components accompanied by an EASA Form 1 (or equivalent bilateral release), unserviceable components undergoing maintenance, unsalvageable components, or standard parts conforming to established industry specifications.

11. What regulatory actions are required upon identifying an unsalvageable component under M.A.504?

Components that have reached their mandatory life limit or contain non-repairable defects must be classified as unsalvageable, physically segregated, and permanently mutilated or controlled to prevent entry into the aviation supply chain.

12. What are the specific requirements for component Certificate of Release to Service (CRS) under M.A.802?

A component CRS (EASA Form 1) must be issued by appropriately authorized Part-145 certifying staff upon completion of component maintenance, verifying that the work was performed in compliance with approved maintenance data.

13. How does the Aircraft Maintenance Programme (AMP) accommodate Instructions for Continued Airworthiness (ICAW)?

Under M.A.302, the AMP must incorporate all mandatory ICAW updates released by the TCH and STC holders. The program must be regularly reviewed, updated, and approved by the competent authority or via an approved indirect approval procedure.

14. What are the compliance requirements for tracking Airworthiness Directives under M.A.303?

The CAMO must control, evaluate, and embody all applicable ADs issued by EASA or the state of design. Records must explicitly detail the AD reference, amendment status, method of compliance, and next due status for repetitive inspections.

Records Integrity, Life-Limited Parts & Aircraft Lifecycle Management

15. What are the core requirements of the Aircraft Continuing Airworthiness Record System under M.A.305?

M.A.305 requires a robust system recording total flight time, hours/cycles of life-limited components, current status of ADs and modifications, service life status of time-controlled items, and current status of the AMP.

16. What information must be logged within the Technical Log System under M.A.306?

For commercial operations, the technical log system must record aircraft details, next maintenance due dates, deferred defects, CRS releases, operational signatures, and crew defect log entries for every flight leg.

17. What steps are mandated during the transfer of aircraft records under M.A.307?

During aircraft transfer, the owner/operator must deliver all M.A.305 continuing airworthiness records to the new owner/operator. Records must include full historical traceability for LLPs, structural modifications, and deferred maintenance logs.

18. What physical and documentation checks are required during an Airworthiness Review under M.A.901?

An Airworthiness Review Certificate (ARC) issuance requires a comprehensive technical records audit combined with a physical survey of the aircraft, verifying structural condition, marking compliance, and registration/safety equipment layout.

19. How long is an Airworthiness Review Certificate (ARC) valid under M.A.902?

An EASA Form 15a/15b ARC is valid for one year. A CAMO may extend an ARC twice for a period of one year each, provided the aircraft has remained in a controlled environment under the same CAMO for the preceding 12 months.

20. What procedures govern the import/export of an aircraft within European Union Member States under M.A.905/M.A.906?

Importing an aircraft into the EU requires an airworthiness review executed by an appropriately approved Part-CAMO. The review validates compliance with EASA type design, completion of mandatory ADs, approval of modifications/repairs under M.A.304, and satisfaction of national authority registration requirements.


Enterprise Training Support

Ensure your technical teams meet strict EASA compliance standards. To register candidates for Part M For Large Aircraft with VO or configure enterprise LMS integration via Sofema Altitude, contact [email protected].

Tags:EASA Part M FAQSubpart C maintenance trackingM.A.305 record keepingEASA Part M large aircraft rulesSubpart I ARC process

Found this useful?

Share it with your network on LinkedIn.

Share on LinkedIn
Back to Blog