Regulation (EU) 2026/100 refines the structural and oversight mandates for Part CAO organizations operating under Annex Vd. It updates interface protocols between continuing airworthiness management and maintenance functions, enforcing stricter baseline alignment for small-to-medium operators and maintenance facilities. Organizations must audit their compliance matrix against these revised standards to ensure terms of approval remain valid without administrative lapses.
The Combined Airworthiness Exposition (CAE) serves as the primary operational document for a Part CAO organization, consolidating maintenance organization exposition (MOE) and continuing airworthiness management exposition (CAME) provisions into a single manual. The CAE must detail organizational scope, management hierarchy, facilities, certifying staff qualifications, airworthiness review procedures, quality systems, or organizational review procedures depending on the complexity of the aircraft managed.
Part CAO allows an organization to hold privileges for maintenance, continuing airworthiness management, airworthiness reviews, and permits to fly under a single approval certificate. Terms of approval specify the exact aircraft ratings, maintenance scope (base or line), and component categories authorized, eliminating the historical administrative burden of maintaining separate Part-145 and Part-M Subpart G approvals for non-complex fleets.
Airworthiness review staff within a Part CAO organization must demonstrate appropriate maintenance licenses (EASA Part-66), relevant aeronautical degrees, or equivalent formal qualifications alongside at least five years of continuous airworthiness experience for complex aircraft, or two years for non-complex aircraft. They must complete formal training on Part CAO obligations, demonstrate practical experience in airworthiness reviews, and receive formal authorization documented within the CAE.
Changes affecting the CAE, accountable management personnel, facilities, or scope of approval require prior approval by the competent authority or approval via an internal procedure authorized within the CAE. Non-compliance or failure to notify the competent authority regarding structural organizational changes can result in immediate suspension or limitation of the Part CAO approval certificate.
Organizations managing non-complex aircraft or non-commercial operations may utilize an Organisational Review system instead of a full Quality System. The Organisational Review relies on periodic internal audits and direct feedback loops to the Accountable Manager, whereas a formal Quality System mandates independent audit functions, continuous monitoring, structured corrective action tracking, and formal quality management oversight.
A Level 1 finding involves a significant non-compliance with Part CAO requirements that lowers safety standards or hazards flight safety, requiring immediate authority action and corrective action prior to flight. A Level 2 finding represents a non-compliance that could lower safety standards or hazard flight safety, requiring a structured Root Cause Analysis (RCA) and corrective action plan submitted within a timeframe agreed upon by the competent authority (typically not exceeding 3 months).
A Certificate of Release to Service (CRS) can only be issued by authorized certifying staff once it is established that all ordered maintenance has been properly carried out in accordance with approved maintenance data (ICAW). The release requires complete work order verification, confirmation of physical completion, correct entry into technical records, and validation that no known non-compliances endanger flight safety.
Part CAO mandates that all components, equipment, and tools be classified, segregated, and stored in environmentally controlled facilities. Incoming components must be accompanied by appropriate release documentation (e.g., EASA Form 1 or equivalent bilateral form). Unserviceable, unsalvageable, or non-conforming items must be strictly segregated in dedicated quarantine areas to prevent unauthorized installation on aircraft.
Work orders generated by a Part CAO organization must incorporate current instructions for continued airworthiness (ICA) issued by the Type Certificate Holder (TCH), Supplemental Type Certificate (STC) holders, or competent authority directives (Airworthiness Directives). Maintenance data must be directly accessible to technical personnel on the shop floor, and work cards must provide clear, unambiguous task steps.
Issuance of an EASA Form 1 requires absolute back-to-birth or last-overhaul documentation traceability. The organization must maintain work packages detailing all replaced sub-components, approved modification data, calibration records of tooling used, and signed work cards from authorized certifying staff confirming compliance with applicable maintenance instructions.
Part CAO requires the establishment of an occurrence reporting system aligned with Regulation (EU) No 376/2014. Any safety incident, technical defect, or airworthiness condition that threatens safe operation must be reported to the competent authority, the state of registry, and the Type Certificate Holder within 72 hours of identification.
The CAO must track, record, and archive all airworthiness data, including Airworthiness Directives (AD), Service Bulletins (SB), aircraft maintenance programs (AMP), modification status, life-limited parts (LLP) usage, and deferred defect logs. All entries must be updated systematically within technical logbooks and software systems to preserve airworthiness status.
A Part CAO organization with airworthiness review privileges can issue an EASA Form 15b (or Form 15c for non-complex) following a full physical and documented airworthiness review. To extend an existing ARC (Form 15a/15b) for a one-year period (up to two consecutive times), the aircraft must have remained continuously in a controlled environment managed by a certified CAO or CAMO for the preceding 12 months.
Technical records must be preserved for a minimum of 36 months after the aircraft or component has been permanently released from service. Records covering life-limited components, engine task logs, structural modification packages, and ARC histories must be maintained in secure, fireproof, or redundant digital environments to avoid multi-million-dollar valuation write-downs during asset transitions.
Part CAO provides tailored privileges allowing small-to-medium operators to manage continuing airworthiness and execute maintenance internally without needing dual organization approvals. While primarily designed for non-complex motor-powered aircraft or non-commercial operations, specific extensions allow managing complex aircraft subject to competent authority evaluation and expanded CAE capability demonstrations.
Prior to component installation, receiving personnel must verify physical condition, check for correct packaging, confirm active shelf-life status, and authenticate the EASA Form 1, FAA Form 8130-3, or Transport Canada TCCA Form One. The certificate must confirm that the component underwent maintenance by an approved organization and is marked with acceptable release codes.
The Accountable Manager holds corporate financial authority for ensuring all maintenance and airworthiness tasks are funded and conducted to EASA standards. They establish human resources, ensure facility adequacy, sign the corporate commitment statement within the CAE, and maintain ultimate accountability for audit compliance and regulatory adherence.
Subcontracted continuing airworthiness management activities must be explicitly listed in the CAE and operated under the CAO's quality or organizational review oversight. The Part CAO organization retains ultimate responsibility for regulatory compliance, requiring routine audits, precise service level agreements (SLAs), and active verification of subcontracted work packages.
Transition risks include manual gaps between old CAME/MOE structures and the unified CAE, unaligned staff authorizations, missing traceability in legacy records, and failure to integrate Regulation (EU) 2026/100 amendments. Unmitigated gaps can lead to regulatory findings, suspension of ARC privileges, or costly lease transition delays exceeding $2.0M USD per narrowbody asset.
Align your management, quality, and certifying staff with EASA Part CAO regulatory obligations. Implement corporate training pathways via Sofema Altitude or enroll technical personnel today.
Contact: [email protected] | Web: www.sofemaaviation.com
Found this useful?
Share it with your network on LinkedIn.