EASA Ground Handling Regulatory Compliance - Cooperative oversight and cross-border coordination for multi-base operators.

This article breaks down EASA’s cooperative oversight framework for multi-base ground handlers, explaining how corporate and local station authorities coordinate cross-border compliance without duplicating oversight.

23-10-2026
10 Min read

Sofema Aviation (SA) Considers Key Elements Related to Cross-Border Coordination


Introduction

Cooperative oversight and cross-border coordination under the EASA ground handling regulations ensure that organisations operating across multiple Member States are monitored efficiently without duplication of effort.

The framework establishes clear divisions of responsibilities, mandatory information sharing, and coordinated enforcement measures among national competent authorities.

Applicability and Scope

Under Point ARGH.OVS.330(b) of Annex (Part-ARGH) to Regulation (EU) 2025/23 and Article 3(18) of Commission Delegated Regulation (EU) 2025/20, cooperative oversight applies to:

  • Independent providers of ground handling services having their Principal Place of Business (PPoB) in an EU Member State and operating at aerodromes across multiple Member States.
  • Stand-alone GH entities or entities part of a single ground handling organisation business grouping (Article 3(2) of Regulation (EU) 2025/20).
  • Self-handling aircraft operators (whether or not part of a single air carrier business grouping).

Allocation of Oversight Responsibilities

Responsibilities are divided to ensure that the organisation is assessed both at the corporate level and at the local operational level.

PPoB Authority Responsibilities (Point ARGH.OVS.330(e))

The authority of the Member State where the organisation's PPoB is located verifies all overarching organisational processes (either independently or supported by other authorities):

  • Management System Core: Overall organisational structure, safety policy, and compliance monitoring function (Point ORGH.MGM.200).
  • Safety Risk Management: Central hazard identification, risk assessments, and mitigation processes.
  • Documentation & Manuals: The central Ground Handling Manual (Point ORGH.DOC.110), document management system, and record-keeping.
  • Programmes: Corporate GH training programmes, training records, and the Ground Support Equipment (GSE) maintenance programme.
  • Change Management: Overarching management of changes (Point ORGH.GEN.130) and declaration updates.

Summary

The competent authority of the Member State where the organisation has its PPoB is responsible for verifying the overarching organisational processes and management system elements. This includes overseeing the safety policy, safety management system (SMS), hazard identification, occurrence reporting processes, compliance monitoring, the ground handling manual, training programmes, and the ground support equipment (GSE) maintenance programme as they apply to the organisation as a whole.

Station-Level Authorities Responsibilities (Point ARGH.OVS.330(f))

Competent authorities in Member States where the organisation operates individual stations oversee the local execution of services:

  • Local Risk Mitigation: Verification of hazard identification and safety risk mitigations specific to the local aerodrome context.
  • Local Documentation: Local content of the GH manual, station-level procedures, integration with aerodrome manual instructions, and aircraft operator instructions.
  • Station Training & GSE: Implementation of training programmes and GSE maintenance at that specific station.
  • Operational Execution: Verification of direct compliance with operational requirements in Annex II (Part-GH.OPS) to Regulation (EU) 2025/20.
  • Station Oversight Planning: Under AMC2 ARGH.OVS.305(d), involved authorities agree on a minimum overall number of stations to oversee within an oversight cycle based on volume of activity, risk areas, and geographical spread.

Declaration & Determination of the Responsible Competent Authority

PPoB Declaration Mechanism: Under Point ORGH.GEN.105(b) of Annex I (Part-ORGH) to Regulation (EU) 2025/20 and Point ARGH.GEN.100(b) of Part-ARGH, a multi-base GH organisation or self-handling air carrier submits its declaration solely to the competent authority of the Member State where its PPoB is located.

Criteria for PPoB: Point ORGH.GEN.105(c) and GM1 ORGH.GEN.105(c) establish three cumulative criteria to determine the PPoB:

  • Corporate Financial Functions: Where financial operations enabling corporate viability and management take place.
  • Accountable Manager Location: Where the Accountable Manager, holding ultimate safety accountability, exercises their role.
  • Effective Centre of Control: The actual centre from which corporate strategy, business development, and operational policy are regularly managed.

Single-Window Effect & Mutual Recognition: Under Point ARGH.GEN.100(c)-(d), once the declaration is submitted to the PPoB authority and transmitted via the Article 74 EASA Repository of Information, it is considered legally submitted to all Member States concerned and valid across the EU without further evaluation.

Information Exchange and Collaboration Tools

To execute cooperative oversight effectively, competent authorities must ensure mutual exchange of information and assistance.

  • Mandatory Data Sharing: Authorities must share the GH organisation's declarations, alternative means of compliance (AltMoC), audit reports, findings, corrective action plans, root-cause analyses, and safety-significant occurrence reports.
  • Repository of Information: Authorities utilize a central repository of information, established under Article 74 of Regulation (EU) 2018/1139, to securely access the necessary documents and compliance data.
  • Cooperative Actions: Authorities may establish procedures to use common toolboxes or checklists for inspections, develop common training programmes for inspectors, organise joint audits, and regularly discuss findings and legal bases to identify the best way forward for similar cases. Additionally, other authorities may directly support the PPoB authority in performing its audits and inspections.

Management of Findings and Non-Compliance

The framework distinguishes between different levels and types of non-compliance to ensure a coordinated response:

  • Systemic vs. Operational Non-Compliance: A systemic non-compliance relates to main components of the management system (e.g., SMS, training programme) and requires enhanced communication and cooperation among all authorities to apply similar corrective actions across affected stations. An operational non-compliance is specific to the local implementation at an individual station and generally does not require action from authorities in other Member States.
  • Level 1 Findings: If a competent authority raises a Level 1 finding (significant non-compliance that seriously jeopardises safety), it must immediately inform all other concerned authorities. Each authority must then assess how the finding affects the stations under its purview and take appropriate action.
  • Lack of Accountable Manager: If a Level 1 finding is raised due to the lack of an accountable manager, all concerned authorities must apply the same enforcement action uniformly across all stations they oversee to remedy the consequences.
  • Corrective Action Plans: Each local authority agrees on proposed corrective action plans for non-compliances identified at its respective stations and informs the other authorities about the audit reports and corrective actions.

Continuous Safety Assessment

All competent authorities involved in overseeing a multi-base operator are required to support the PPoB authority by providing their local oversight reports. This collective data enables the PPoB authority to periodically update the overall assessment of the GH organisation's safety performance.

Station-Level Authorities Responsibilities (Point ARGH.OVS.330(f))

Competent authorities in Member States where the organisation operates individual stations oversee the local execution of services:

Local Risk Mitigation: Verification of hazard identification and safety risk mitigations specific to the local aerodrome context.

Local Documentation: Local content of the GH manual, station-level procedures, integration with aerodrome manual instructions, and aircraft operator instructions.

Station Training & GSE: Implementation of training programmes and GSE maintenance at that specific station.

Operational Execution: Verification of direct compliance with operational requirements in Annex II (Part-GH.OPS) to Regulation (EU) 2025/20.

Station Oversight Planning: Under AMC2 ARGH.OVS.305(d), involved authorities agree on a minimum overall number of stations to oversee within an oversight cycle based on volume of activity, risk areas, and geographical spread.

.330(i)): Station authorities may directly assist or join the PPoB authority during audits of the organisation’s head office or major hubs.

Common Oversight Toolboxes (GM3 ARGH.OVS.330(g);(j)): Authorities are encouraged to establish:

  • Standardized inspection checklists and auditing toolboxes.
  • Joint inspector training programmes and cross-border inspector exchange schemes (AMC6 ARGH.MGM.200(b)).
  • Agreed translation protocols (e.g., translating audit summary reports into English).

Information Exchange, Coordination & EASA Support

Mandatory Data Exchange (Point ARGH.OVS.330(c))

Authorities are legally required to exchange:

  • Declarations and supporting compliance documentation.
  • Alternative Means of Compliance (AltMoC) applied.
  • Audit reports, findings, corrective action plans, root cause analyses, and enforcement actions.
  • Safety occurrence reports (under Point ORGH.GEN.160 and Regulation (EU) No 376/2014).

EASA Repository & Agency Support

  • Information Repository: Authorities use the central repository of information under Article 74 of Regulation (EU) 2018/1139 to store and access shared oversight records (Point ARGH.OVS.330(k)).
  • Agency Role: Article 5 of Regulation (EU) 2025/23 mandates that EASA facilitate effective cooperative oversight by maintaining secure infrastructure for data exchange.
  • AltMoC Coordination (AMC1 ARGH.OVS.330(c)(2)): If an AltMoC submitted under Point ORGH.GEN.120 applies to specific aerodromes or across all stations, the PPoB authority ensures all affected authorities access it and collaborate to ensure uniform acceptance.

Management of Non-Compliance, Findings, and Enforcement

Point ARGH.OVS.330(g) and associated Guidance Material establish how findings are classified and managed in multi-base operations:

1. Systemic vs. Operational Non-Compliance (GM1 & GM2 ARGH.OVS.330(g);(j))

  • Systemic Non-Compliance: Refers to deficiencies in core components of the management system (e.g., SMS, compliance monitoring, central training programmes, GSE maintenance scheme). When raised by the PPoB authority, it is communicated to all station authorities. If raised by a station authority, it is escalated to the PPoB authority to verify if the root cause exists at the corporate level. All concerned authorities must apply harmonized corrective action expectations across all stations.
  • Operational Non-Compliance: Specific to local execution at an individual station (e.g., failure to chock an aircraft at station X). It is managed locally between the station authority and the local station management without requiring action from other Member States.

2. Communication & Internal Reporting (Point ORGH.GEN.150(b))

The GH organisation must ensure that any finding raised at an individual station, along with the associated root cause analysis and Corrective Action Plan (CAP), is formally transmitted by the station manager to the head office at the PPoB.

3. Escalation & Level 1 Findings (Point ARGH.OVS.330(g))

  • Immediate Notification: When a Level 1 finding (a severe non-compliance endangering flight or ground safety) is raised by any competent authority, it must immediately notify all other involved authorities.
  • Cross-Station Risk Impact Assessment: Each authority evaluates if the Level 1 finding affects the stations within its jurisdiction and applies proportional limitation/enforcement measures.
  • Absence of Accountable Manager: If a Level 1 finding is issued due to the lack of an Accountable Manager (Point ARGH.OVS.325(b)(3)), all involved authorities must uniformly enforce identical limiting or suspending actions across all stations in the EU.

Common Oversight Toolboxes (GM3 ARGH.OVS.330(g);(j))

Authorities are encouraged to establish:

  • Standardized inspection checklists and auditing toolboxes.
  • Joint inspector training programmes and cross-border inspector exchange schemes (AMC6 ARGH.MGM.200(b)).
  • Agreed translation protocols (e.g., translating audit summary reports into English).
Tags:EASA ground handlingCooperative oversightCross-border coordinationMulti-base operatorsSofema Aviation (SA)

Found this useful?

Share it with your network on LinkedIn.

Share on LinkedIn
Back to Blog